WILLEM DE VLAMINGH
IMO number: |
9807580 |
---|---|
Call sign: |
PC7355 |
MMSI number: |
244216785 |
Flag: |
Netherlands |
Port of registry: |
Terschelling |
Registered owner: |
Terschellinger Groenvloot Maatschappij B.V., Terschelling |
Commercial manager: |
B.V. Rederij G. Doeksen en Zonen, Harlingen |
Shipyard: |
Strategic Marine Shipyard, Vung Tau / H388 |
Keel laid: |
09-08-2016 |
Launch date: |
19-01-2019 |
Seatrail date(s): |
29-12-2020 |
Delivery date: |
22-12-2020 |
In service: |
26-01-2021 |
Route: |
Harlingen-Terschelling/Vlieland |
Gross tonnage: |
3744 |
Deadweight: |
319 |
Length overall: |
70.60 M |
Length BPP: |
69.60 M |
Beam: |
17.30 M |
Draught: |
2.60 M |
Passengers: |
692 |
Cars: |
66 |
Main engine: |
2x MTU 15V4000 LNG |
Power: |
1492 kW |
Speed in knots: |
14 |
Ship history & data
Ship history data | |
2020: WILLEM DE VLAMINGH![]() Terschelling / Netherlands (22-12-2020) | Owner: Terschellinger Groenvloot Maatschappij B.V., Terschelling Manager: B.V. Rederij G. Doeksen en Zonen, Harlingen |
Additional info | |
09-08-2016: | Keel laid at Strategic Marine Shipyard, Vung Tau. |
19-01-2019: | Christened by Mrs. Christine Doeksen-van Galen Last (wife of Jan Willem Doeksen, CEO of Koninklijke Doeksen) and launched. |
04-03-2019: | Hoisted aboard ‘SUN RISE’ (IMO 9623219). |
08-03-2019: | Departed from Vung Tau to Den Helder. |
27-05-2019: | ‘SUN RISE’ anchored near Den Helder. |
29-05-2019: | Arrived in Harlingen to be completed by Nesta Shipping B.V. |
22-12-2020: | Delivered to Terschellinger Groenvloot Maatschappij B.V., Terschelling, under management at Rederij G Doeksen en Zonen B.V. |
29-12-2020: | Sea trials on Wadden Sea from Harlingen. |
07-01-2021: | Sea trials on Wadden Sea. |
25-01-2021: | Sea trials on Wadden Sea. |
26-01-2021: | In service. |
06-01-2025: | Arrived at Damen Shiprepair B.V. in Harlingen for conversion to LNG hybrid and placement of 900 kWh battery pack. Two extra bow thrusters installed, which allows the ship to maneuver even better in strong winds. |
09-04-2025: | Sea trials on Wadden Sea. |
18-04-2025: | Back in service. |
Latest data adjustment: 21-04-2025