NOORD NEDERLAND
IMO number: |
9269611 |
---|---|
Call sign: |
PBJN |
MMSI number: |
244296000 |
Flag: |
Netherlands |
Port of registry: |
Terschelling |
Registered owner: |
B.V. Terschellinger Stoomboot Maatschappij, Terschelling |
Commercial manager: |
B.V. Terschellinger Stoomboot Maatschappij, Terschelling |
Shipyard: |
ASB Aluminium & Steel Boats, Harwood / 228 |
Keel laid: |
23-01-2002 |
Launch date: |
01-06-2002 |
Delivery date: |
12-06-2002 |
In service: |
12-06-2002 |
Route: |
Harlingen-Terschelling/Vlieland |
Gross tonnage: |
361 |
Net tonnage: |
108 |
Deadweight: |
204 |
Length overall: |
48.00 M |
Beam: |
15.25 M |
Depth: |
3.50 M |
Draught: |
1.523 M |
Passengers: |
12 |
Trucks: |
12 |
Main engine: |
4x Deutz BF6M1015MC |
Power: |
1072 kW |
Speed in knots: |
15 |
Ship history & data
Ship history data | |
2002: NOORD NEDERLAND![]() Terschelling / Netherlands (12-06-2002) | Owner: B.V. Terschellinger Stoomboot Maatschappij, Terschelling Manager: B.V. Terschellinger Stoomboot Maatschappij, Terschelling |
2010: NOORD NEDERLAND![]() Terschelling / Netherlands (00-00-2010) | Owner: B.V. Rederij G. Doeksen en Zonen, Harlingen Manager: B.V. Rederij G. Doeksen en Zonen, Harlingen |
Additional info | |
10-06-2002: | Launched. |
12-06-2002: | Delivered to B.V. Terschellinger Stoomboot Maatschappij, Terschelling. |
13-06-2002: | After trial runs under our own power, we sailed from Yamba to Brisbane in 12 hours and on lifted aboard heavy-cargo ship ‘PASSAT’ (1992) from Combilift. |
13-06-2002: | Departed with 3 more yachts on board, via Singapore, India and Sardinia (unloading yachts) to Rotterdam. |
08-08-2002: | First arrival Terschelling and christened by Mrs. Doeksen (wife of chairman of the board G.J. Doeksen van Doeksen Transport Groep B.V.). |
09-08-2002: | Officially commissioned by Mrs. Liesbeth Arlman (wife of mayor Harlingen). |
10-01-2017: | Arrived at Shipdock Harlingen B.V. for extension. |
10-03-2017: | Launched after extension and repowering. LOA: 68.90, Lbp: 65.60, B: 15.25, D: 3.50, Draught: 1.52 M. 4x Deutz TCD2015V06M, 1308 kW. |
13-03-2017: | Sea trials on Wadden Sea after extension. |
16-03-2017: | Sea trials on Wadden Sea. |
17-03-2017: | Back in service. |
09-08-2017: | Engine problems suffered because an engine broke from the supports. |
10-08-2017: | Departures arranged with the help of push boat ‘AEGIR’. |
15-08-2017: | Start of engine repairs. |
18-08-2017: | Back in service using two engines. |
30-12-2023: | Arrival Damen Shiprepair Harlingen B.V. for repowering. |
19-02-2023: | Departure yard after repowering, 5x Scania D13. |
Latest data adjustment: 27-10-2024