PEAK SAUDA
| IMO number: | 9187136 |
|---|---|
| Call sign: | PHQA |
| MMSI number: | 245871000 |
| Flag: | Netherlands |
| Port of registry: | Delfzijl |
| Registered owner: | Norwegian Fjord B.V., Delfzijl |
| ISM Manager: | Norwegian Fjord B.V., Delfzijl |
| Commercial manager: | Peak Projects Carriers AS, Nyborg |
| Shipyard: | Damen Yichang Shipyard Co., Yichang / 741 |
| Keel laid: | 12-03-1999 |
| Launch date: | 23-06-1999 |
| Delivery date: | 10-09-1999 |
| Gross tonnage: | 2999 |
| Net tonnage: | 1714 |
| Deadweight: | 5000 |
| Length overall: | 94.99 M |
| Length BPP: | 90.25 M |
| Width: | 13.17 M |
| Draught: | 6.19 M |
| TEU: | 224 |
| Main engine: | MaK 8M25 |
| Power: | 1800 kW |
| Speed in knots: | 12 |
Ship history & data
Ship history data | |
| 1999: CLAUDIA Basel / Switserland (10-09-1999) | Owner: MV “Claudia” AG., Bern Owner: Enzian Shpping AG., Schlieren |
| 2006: CLAUDIA Basel / Switserland (13-04-2006) | Owner: MV “Claudia” AG., Bern Manager: Carisbrooke Shipping Ltd., Cowes |
2008: CLAUDIA-C 2AJI7Cowes / United Kingdom (24-01-2008) | Owner: Carisbrooke Shipping Ltd., Cowes Manager: Carisbrooke Shipping Ltd., Cowes |
2008: SOLVI A PHQARidderkerk / Netherlands (17-07-2008) | Owner: CA Bulkships AS, Ridderkerk Manager: Vaage Ship Management AS, Bergen |
2013: SHARON PHQADelfzijl / Netherlands (07-10-2013) | Owner: Miss Sharon B.V., Delfzijl Manager: Flagship Management Co. B.V., Farmsum |
2015: SHARON PHQADelfzijl / Netherlands (20-11-2015) | Owner: Eems Beheer VII B.V., Delfzijl Manager: Wagenborg Shipping B.V., Delfzijl |
2019: PEAK SAUDA PHQADelfzijl / Netherlands (20-03-2019) | Owner: Norwegian Fjord B.V., Delfzijl Manager: Peak Projects Carriers AS, Nyborg |
Additional info | |
| Design: | Damen Combi Freighter 5000 |
| 12-03-1999: | Keel laid. |
| 23-06-1999: | Launched at Damen Yichang Shipyard Co., Yichang. |
| 10-09-1999: | Delivered to MV “Claudia” AG., Bern. After her maiden voyage from China to Europe she was taken to the B.V. Scheepswerf Damen Hoogezand, Foxhol. |
| 25-11-1999: | Sea trials. |
| 27-11-1999: | Sea trials. |
| 29-11-1999: | Sea trials. |
| 15-12-1999: | Christened by Mrs. Claudia Wengle-Böhi in Rotterdam. |
| 06-03-2013: | Arrived at Dockside Shipyard, IJsselmonde and laid-up with “SOFIE N”. |
| 20-03-2013: | Arrived in Waalhaven-Rotterdam. |
| 07-10-2013: | Renamed “SHARON”. |
| 08-10-2013: | Departed from Rotterdam to Antwerp. |
| 02-04-2019: | In Szczecin renamed “PEAK SAUDA”. |
Latest data adjustment: 31-12-2025

2AJI7
PHQA