PACIFIC DAWN

IMO number:

9558464

Call sign:

PBTM

MMSI number:

245118000

Nat. Official Number:

22745 Z 2010

Flag:

Netherlands

Port of registry:

Urk

Registered owner:

Hartman Shipping 1 B.V., Urk

ISM Manager:

Hartman Shipping B.V., Urk

Commercial manager:

Hartman Shipping B.V., Urk

Shipyard:

Hartman Marine Shipbuilding B.V., Urk / 3

Contractor:

Partner Sp.z.o.o., Police

Seatrail date(s):

22-09-2010

Delivery date:

24-09-2010

Gross tonnage:

2981

Net tonnage:

1198

Deadweight:

3394

Length overall:

104.80 M

Length BPP:

97.90 M

Beam:

7.40 M

Draught:

5.81 M

TEU:

236

Main engine:

Wärtsilä 8L32

Power:

3680 kW

Speed in knots:

18

Ship history & data

Ship history data

2010: PACIFIC DAWN
NL 1 PBTM
Urk / Netherlands
(24-09-2010)
Owner: Hartman Shipping 1 B.V., Urk
Manager: Hartman Shipping B.V., Urk
Shareholder: Daniël Hartman

Additional info

27-04-2010:Departed from Szczecin.
01-05-2010:Hull arrived in Velsen behind the tug “TAUCHER O. WULF 5”, completed in Urk by Hartman Marine Shipbuilding B.V.
17-09-2010:Arrived in Velsen from Urk.
22-09-2010:Sea trials on North Sea from Velsen.
24-09-2010:Delivered to Hartman Shipping 1 B.V., Urk.
02-01-2012:Arrived at Hull, suffered flooding to her engine room due to a problem with a valve.
15-01-2012:Arrived behind the tugboat “WATERMAN” in IJmuiden and was then towed by the tugboats “WATERPOORT” and “WATERSTAD” to Urk for repairs.
17-01-2012:Transport didn’t get further than the Oranjesluizen due to too large draft for the port of Urk, with tugboats “WATERPOORT” and “WATERSTAD” back to Velsen and moored at Grote Hout.
13-02-2012:Towed to Shipdock B.V. in Amsterdam with tugboats “ZEELAND” and “SIMSON”.
24-03-2012:Sea trails after repairs.
19-03-2016:Ssuffered engine failure in the Waden Sea short after leaving Harlingen and ran aground on the breakwater of the Pollendam off the harbor entrance of Harlingen. Anchored in the Kimstergat, north of Harlingen where the main engine could be restarted. In the early evening the “PACIF DAWN” could continue her journey, accompanied by several tugs, and headed to Mongstad.


Latest data adjustment: 19-12-2023